A proactive Mechanical & Electrical Engineering solution
ask@tssfacilities.co.uk

Call us: 01273 719111

Grand Hotel water tanks - Brighton

Challenge

The water tanks at the De Vere Grand Hotel in Brighton did not conform to current water legislation and they were corroded and leaking. The tanks were also oversized for the requirement.

Solution

TSS Facilities were required to install correctly sized tanks which conform to water legislation. The new tanks would improve usage and efficiencies of the hotel's water systems.

Benefits

  • The correct turnover of water and temperatures is now adhered to
  • The new tanks meet L8 water regulations
  • Cost savings have been made due to water usage and heat loss providing greater energy efficiency.

Contact us today for a free consultation and our qualified team will discuss your specific needs with you as soon as possible.

Free consultation

Fill in the form below, and we'll call you back to discuss your questions and arrange a survey

Areas of interest

Privacy Policy

Water hygiene

Water hygiene

A professional team in water testing, risk assessment and treatment.

more

Air con

Installing, maintaining and repairing air con systems for more than 40 years...

more