
London Underground
Tank Replacement Project for London Underground, Acton
Project Overview
Our team successfully completed a tank replacement project for London Underground at their Acton facility. The objective was to replace four ageing galvanised tanks with a single, compliant 2000L GRP tank while ensuring minimal disruption to the water supply system.
Scope of Work
- Removal of four existing galvanised tanks
- Installation of a new 2000L GRP tank in compliance with regulations
- Pipework modifications within the plant room
- Ensuring continuous cold water down service to the changing rooms and toilets within the train workshop
Project Execution
Provided comprehensive Risk Assessment and Method Statements (RAMS) to the client before work commenced
Carried out the removal of old galvanised tanks and ensured all scrap material was disposed of by a licensed waste carrier
Completed all necessary pipework modifications in the plant room to accommodate the new system
Installed the new GRP tank, ensuring full compliance with London Underground’s operational standards
Project Outcomes
The job was completed within the given timescale, ensuring no delays to London Underground operations
Delivered the project within the agreed budget, demonstrating cost efficiency
Ensured minimal disruption to the water service, maintaining the comfort and functionality of the changing rooms and toilets throughout the process
The client expressed satisfaction with the smooth execution and successful completion of the project
Conclusion
This project showcased our ability to carry out complex water system upgrades within a demanding operational environment. By adhering to strict safety, compliance, and budgetary requirements, we delivered a seamless transition to a more efficient and reliable water storage system for London Underground.
Another seamless collaboration of TSS Facilities & AC South working together: AC South
Overview:
- Replaced four ageing galvanised tanks with a compliant 2000L GRP tank
- Modified pipework to fit the new system
- Ensured continuous water supply to changing rooms & toilets
- Completed on time & within budget
Our Services:
No robots. No call centres.
TSS Facilities has no call centres or automated robot messaging. Our friendly, professional and reliable staff are always happy to receive any enquiry to discuss your needs or provide advice for your air conditioning units.
We offer free quotations from our team of engineers.
Call us on: 01273 719 111